Section 3.18 Hazardous Sites

Remove the following provision:

  • Notwithstanding any other provisions in the By-law, no building or structure, or sewage tank installation including the weeping tile field, shall be located within 15 metres from the top of bank of any embankment, the slope of which is greater than 30% from horizontal. A reduction in this setback shall only be considered through an application for minor variance or Zoning By-law amendment, and shall be supported by an appropriate assessment of the slope by a qualified professional. 
Share Section 3.18 Hazardous Sites on Facebook Share Section 3.18 Hazardous Sites on Twitter Share Section 3.18 Hazardous Sites on Linkedin Email Section 3.18 Hazardous Sites link
Reply notification settings
loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
Submitting your comment
Cancel
    <span class="translation_missing" title="translation missing: en-US.projects.forum_topics.show.load_comment_text">Load Comment Text</span>