Keeley Road Reconstruction

The Township of South Frontenac will be reconstructing the 2.2 km section of Keeley Road from 300 m East of Sydenham Road to 1,400 m East of Sydenham Road. during the summer of 2026. Keeley Road was selected as a priority project for 2026 due to the poor road surface ratings identified within the Township’s 2022 Comprehensive Road Needs Study. The pavement condition ratings for the roadway were 44 (Poor) in 2025. Ongoing increases in unplanned maintenance and repair costs for pothole repairs and edge break-up also led to the current timing of the project.

The project includes the following activities and improvements:

  • Existing roadway will be pulverized, re-graded and built-up with an improved granular base to meet the design cross-section
  • Road cross-culverts will be removed and replaced with like for like structures. Private driveway culverts will also be replaced
  • Ditching improvements will be carried out for improved roadside drainage
  • Roadway will be finished with a new double surface treatment (chip seal) and a fog seal

This work is categorized as “Exempt” under the 2024 Municipal Class Environmental Assessment process and is considered a pre-approved construction project under the Ontario Environmental Assessment Act.

Further information on the selected contractor and start dates will be provided on this web page. Notices will also be issued to properties fronting on the project.

The Township of South Frontenac will be reconstructing the 2.2 km section of Keeley Road from 300 m East of Sydenham Road to 1,400 m East of Sydenham Road. during the summer of 2026. Keeley Road was selected as a priority project for 2026 due to the poor road surface ratings identified within the Township’s 2022 Comprehensive Road Needs Study. The pavement condition ratings for the roadway were 44 (Poor) in 2025. Ongoing increases in unplanned maintenance and repair costs for pothole repairs and edge break-up also led to the current timing of the project.

The project includes the following activities and improvements:

  • Existing roadway will be pulverized, re-graded and built-up with an improved granular base to meet the design cross-section
  • Road cross-culverts will be removed and replaced with like for like structures. Private driveway culverts will also be replaced
  • Ditching improvements will be carried out for improved roadside drainage
  • Roadway will be finished with a new double surface treatment (chip seal) and a fog seal

This work is categorized as “Exempt” under the 2024 Municipal Class Environmental Assessment process and is considered a pre-approved construction project under the Ontario Environmental Assessment Act.

Further information on the selected contractor and start dates will be provided on this web page. Notices will also be issued to properties fronting on the project.

  • Update - May 28, 2026

    UPDATE – May 28, 2026 – The Keeley Road Reconstruction project from 300m East of Sydenham Road to 1,400m East of Sydenham Road will be happening soon. Township forces will be completing this work. Weather dependent, crews are planning to mobilize to the project to starting June 1, construction activities will continue for approximately six (6) weeks through to mid July. During construction, lane closures and traffic delays should be expected. Notifications of the project will also be sent to emergency services and school transportation providers.

    For further updates on the project please follow the Engage South Frontenac project page. Thank you for your cooperation as we work to improve local roads and bridges in South Frontenac.

    UPDATE – May 28, 2026 – The Keeley Road Reconstruction project from 300m East of Sydenham Road to 1,400m East of Sydenham Road will be happening soon. Township forces will be completing this work. Weather dependent, crews are planning to mobilize to the project to starting June 1, construction activities will continue for approximately six (6) weeks through to mid July. During construction, lane closures and traffic delays should be expected. Notifications of the project will also be sent to emergency services and school transportation providers.

    For further updates on the project please follow the Engage South Frontenac project page. Thank you for your cooperation as we work to improve local roads and bridges in South Frontenac.

  • News Feed

Page last updated: 28 May 2026, 08:52 AM