Why is the road being reconstructed now?

    North Shore Road from Leland Road to Convery Lane was selected for rehabilitation due to its very poor road surface ratings in the Township’s 2022 Comprehensive Road Need Study, along with escalating maintenance costs.

    When will construction start?

    Construction is expected to start in May 2023 and last until September 2023.

    Who will complete the work?

    The reconstruction project will be led by Township forces and will include contracted support for the materials and rented equipment. Placement of the final double surface treatment works will be carried out by a separate Contractor.

    What is the budget and where did the funding come from?

    The overall budget for the project is $636,700 with funding from asset investment reserves.

    How will this affect traffic in the area?

    Traffic access on North Shore Road will be provided at all times and a minimum of one lane will be maintained during active construction for emergency services vehicles. Traffic delays should be anticipated from time to time for the duration of the project. Drivers must drive with caution and obey all traffic signage and personnel at all times.

    Is there anything I need to do to prepare for the construction?

    Landscaping features, flowers, fencing, or other physical objects located in the Township road allowance in front of your property may need to be relocated before construction to avoid damage. Landowners will be individually contacted where concerns are found.

    What do I do if I have mobility or accessibility needs or concerns?

    Individuals with mobility or accessibility needs should contact the Township to discuss accommodations needed during construction. The Township will work with landowners to accommodate resident requirements wherever possible.

    How will this impact mail delivery?

    Access to mailboxes may be restricted for a short period of time while the work is being carried out. Mailboxes that need to be removed will be reinstalled at the sole cost of the Township. Residents will be notified prior to mailbox relocation.

    Will my driveway access be impacted by construction?

    Resident access to their properties may be restricted for a short period of time while certain works are being carried out. The Township will aim to provide a minimum of 24 hours notice ahead of these planned disruptions.

    Will the construction work interfere with garbage or recycling collection?

    Residents should continue to place garbage and recycling out for collection at end of their driveway by 7 am on their regular collection day. During construction, the Township may move a resident’s garbage and recycling materials to a centralized collection location for safety and convenience. The Township will return recycling boxes and garbage cans to each property after collection has been completed. Residents can help by adding their civic address to their blue boxes or garbage cans using a permanent black marker.

    What will the Township do about dust control?

    During construction, the Contractor will use watering trucks and/or dust suppressants to manage dust control.

    Will the fence at the front of the lot be impacted by the construction work?

    If any grading or ditching work has an impact on fencing, the Township will contact individual landowners in advance to discuss the details of any improvements prior to the work.

    What will the hours of work be on the project?

    Work will typically be done Monday to Friday from 7 am to 7 pm in accordance with By-Law 2015-41 - To Prohibit and Regulate Noise Within the Township of South Frontenac.   

    Weekend work may only be considered late in the project if weather delays are encountered. If weekend work is deemed necessary, advance notice will be provided to the area so that residents may plan accordingly.

    What do I do if I live on the road and have key events or activities (moving, family gathering, weddings, pool installations, site construction, etc..) planned this summer?

    Residents are encouraged to reach out to the Township in advance to advise of any special events or activities that may be happening at their property this summer. Township crews will do their best to plan or schedule works in a manner that reduces inconveniences where possible.

    Please contact Public Services at 613-376-3027 Ext. 4331 or email pwsupport@southfrontenac.net

    Will I be able to park on the road this winter or summer?

    No parking will be allowed on the road for the duration of construction.

    How do I stay informed on this project as it progresses?

    Residents within the work zone on North Shore Road and surrounding areas are encouraged to subscribe or follow this project online to stay up to date on the progress.

    Other options include reaching out by phone or email to 613-376-3027 Ext. 4331 or pwsupport@southfrontenac.net with contact information for your property. This will help the Township keep you informed as the project continues. Email addresses can be used to push information updates to residents, however individual addresses will not be shared for any other purpose. Please use the subject line “North Shore Road Rehabilitation”.