The existing bridge has been removed at Elbow Creek and preparations for the new prefabricated bridge are almost completed, well ahead of the bridge's arrival. The new bridge will be delivered and installed in mid November. Below are photos of the works under way.


Bridge partially removed.




Foundation concrete pour





Excavator removing existing piles




Foundation for bridge footings